Rocky Mountain Telecom Corp.
R.M.T.C. Contact Info and Estimates
This form does not yet contain any fields.
    LABOR RATES
    Sunday
    Aug212011

    KOKANEE SPRINGS GOLF RESORT

       Located in beatiful Crawford Bay British Columbia RMTC was a successful contractor to upgrade current wireless WAN/LAN infrastucture to a modern single mode fiber solution which required lashing a Corning indoor outdoor fiber to the existing copper areial cable. This was accomplished in one weekend and is currently suppling a Giga Bit network to Clubhouse and Restaurant areas.

     These pictures taken in 2010 by Holly Wilkinson in April 2010 assisted by a construction Guru Greg Seiderer from Banff.  

    Monday
    Aug082011

    NORTEL NETWORKS EMPLOYEE GRATITUDE

    The letter is from Edward V.T. Ashby Product Verification Consultant Notel Networks April 12 2003.

     

    Monday
    Aug082011

    BC HOTSPOT Rocky Mountain Ski Lodge Canmore Alberta

      After years of frustration from a prvious provider of a guest wireless service the Rocky Mountain Ski Lodge can now provide a secure and management system to its guests that can accomodate the flexibility of differing bandwidths and secure system access upon demand.

    Letter from Donna Trautman   General Manager

    Thursday
    Aug042011

    Sommet KANANASKIS Summit CANADA 2002

     

     Rocky Mountain Telecom contracted by Government of Canada to provide Data Voice facilities for the G8 summit located in the spectacular Delta Lodge @ Kananaskis in June 2002.

      Technicians Kim Hysert, Steve Michie, Alex Popoff, Leon White, Jesse Aesenault and Chris Lamb installed 565 certified telephone and data cable runs located at Delta Lodge @ Kananaskis, Boundary Ranch, and Executive Resorts of Kananaskis (Mount Kidd Manor currently named). This install also included 300 telephone installs including analog, digital and ISBN BRI applications to provide voice data and video conferencing facilities.

      The installations also included  combined efforts with Mike's Electric in Banff to cable RCMP locations with single mode fiber infrastructure for security and secure communications.

      These installations were completed in a 15 day time limit and was considered one of the quickest and most successful G8's to this day.

    Copy of Letter from Colonel Bob Corley  Director of Facilities and Operations:

     

     Letter from Brenda Heniuk TELUS Accounts Executive  GOC